Friday, 6 November 2009

Moving In November 2009 - basement 2

The end of the basement area under the hall and kitchen areas. A large open 'fire' is only just visible. We were told that this area was habitable some years ago and the residents used to do their loo in an outhouse that drained into the burn! The hope, eventually, is to turn this into a self-contained holiday let with an open plan sitting room kitchen, bathroom and bedroom. The door leads out directly to the basement garden and there is an archway to the kitchen garden and to the road side garden.

Moving In November 2009 - basement

The basement area which is directly beneath the sitting room. The beams and end wall are earth bearing due to the sloping site of the house.

Moving In November 2009 - bathroom

No shower which means a hose down in the bath every morning - not ideal. One of the rooms we're looking forward to developing.

Moving In November 2009 - Blair's office

Technically the 3rd bedroom. A strange shape due to the staircase.

Moving In November 2009 - sitting room

The coal fire is fantastic when lit. The chimney sweeps tells us its original to the house which is a great feature.

Moving In November 2009 - kitchen 2

Thank heaven for microwaves!

Moving In November 2009 - kitchen

No washing machine or cooker for 2 weeks!

Moving In November 2009

Our new house! You can see evidence of an old outbuilding at the gable end - this used to be a laundry and coal house. We hope to be able to build this up again into a store room at the bottom and a small conservatory at the top.